View Single Post
  #3 (permalink)  
Old 03-16-2013, 07:23 PM
JJohnston82
Guest
 
Posts: n/a
Post Thanks / Like
Thanks (Given):
Thanks (Received):
Likes (Given):
Likes (Received):
Default

That was the plan:
1-12 Test E 750mg/wk
1-10 NPP 4-500/wk
1-5 50mg Dbol

But I read that since NPP is a short ester, starting it at the beginning of a cycle with a long ester test will basically be the same as running the NPP alone for the first 5 weeks or so or until the test kicks in, which will shut you down without any other form of test being there. That is why I was wondering if front loading with prop until the enan has had time to build up would be a good idea. That way you have a fast acting test to go with the fast acting NPP and then just come off the prop once the longer ester test has taken over and continue on with the NPP?
Reply With Quote
 

SEO by vBSEO 3.3.0